Post a job
All new jobs
Signage / POSM

Replace 5 m × 2 m signboard face; materials and installation labor needed

Tan Binh District, Ho Chi Minh CityPosted 17/11/2026, 00:43Expires 20/11/2026, 00:43

The customer needs to replace a 5 m × 2 m signboard face at Bùi Thế Mỹ, Bảy Hiền Ward, Tan Binh. A suitable signboard face sample is available. Materials, dismantling and installation required, with a budget under 2.5 million VND.

  • Replace the signboard face, 5 m wide × 2 m high
  • Materials and dismantling/installation labor required
  • Budget under 2.5 million VND

Automatically translated from Vietnamese. If anything is unclear, check the original post. View original (Vietnamese) ↗

Contact the job owner

Contact details are unlocked for free on the original Vietnamese page. Tap below, then use “Mở liên hệ” (unlock contact) to call or message the job owner directly.

Open contact page