Floor Demolition and Construction Waste Removal Crew
Floor demolition and construction waste removal crew; finish the elevator wall surfaces and approximately 120 m² of flooring; tiles may need to be supplied
- Floor demolition and construction waste removal crew
- Finish the elevator wall surfaces and approximately 120 m² of flooring
- Tiles may need to be supplied
Automatically translated from Vietnamese. If anything is unclear, check the original post. View original (Vietnamese) ↗
Contact the job owner
Contact details are unlocked for free on the original Vietnamese page. Tap below, then use “Mở liên hệ” (unlock contact) to call or message the job owner directly.
Open contact page